28-01-2025 |
Notification S.R.O No.
73(I)/2025 - i.) Decision of the
Authority dated December 05, 2024 in the
matter of Suo Moto Proceeding regarding
transition from London Interbank Offered
Rate to Secured Overnight Financing Rate ii) Decision of the Authority dated December 13, 2024 under NEPRA (Review Procedure) Regulations. 2009 in the matter of SUO MOTO proceedings regarding transition from London Interbank Offered Rate (LIBOR) to Secured Overnight Financing rate |
|
13-12-2024 | Decision of the Authority under NEPRA (Review Procedure) Regulations. 2009 in the matter of SUO MOTO proceedings regarding transition from London Interbank Offered Rate (LIBOR) to Secured Overnight Financing rate (SOFR) | View |
05-12-2024 | Decision of the Authority in the matter of Suo Moto Proceeding regarding Transition from London Interbank offered Rate (LIBOR) to Secured Overnight Financing Rate (SOFR) | View |
09-08-2023 | Notification S.R.O 1041(I)/2023 - Federal Government is pleased to notify as under decision of the National Electric Power Regulatory Authority, in the matter of change of base year 2007-08 to base year 2015-16 for consumer price index (CPI) for indexation of fixed and variable O&M (local) components of generation tariff | View |
10-03-2021 | Decision of the Authority in the matter of Change of Base Year 2007-2008 to Base Year 2015-16 for Consumer Price Index (CPI) for Indexation of Fixed and Variable O&M (Local) Components of Generation Tariff | View |
09-05-2016 | Decision of the National Electric Power Regulatory Authority in the Matter of Application for Unconditional Acceptance of Upfront Tariff for Small Hydro Power Projects filed by Alka Power Private Limited (APPL) for its 1.8 MW Hydropower Project at RD 69, Jhang Branch Canal, Punjab | |
15-05-2014 | Determination of the National Electric Power Regulatory Authority in the matter of Tariff Petition filed by ALKA Power (Pvt.) Ltd. |
23-11-2018 | Decision of the Authority in the matter of Motion for Leave for Review filed by Sarhad Rural Support Programme against Decision dated 21.05.2018 in the matter of Cost Plus Tariff of 2 MW Birmogh Golen Hydro Power Project | |
21-05-2018 | Determination of the Authority in the matter of Cost Plus Tariff Petition of 2 MW Birmogh Golen Hydro Power Project, District Chitral, Khyber Pakhtunkhwa |
28-03-2012 | Determination of the Authority in the matter of Tariff Petition filed by Chenab Energy (Pvt.) Ltd for Determination of Feasibility Stage Tariff for 4.8 MW Sahiwal Hydropower Project |
21-08-2020 | Decision of the Authority in the matter of Tariff Proposal submitted by Dhadar Hydropower (Pvt.) Ltd. for 18.18 MW Hydropower Project |
20-04-2012 | Decision of the Authority on Review Petition filed by Frontier Mega Structure & Power (Pvt.) Ltd. against Tariff Determination dated February 10, 2012 | |
10-02-2012 | Determination of the Authority in the mater of Tariff Petition filed by Frontier Mega Structure & Power (Pvt.) Ltd - Ghanool Hydropower Project |
21-08-2020 | Decision of the Authority in the matter of Tariff Proposal submitted by Frontier Power Shogo-Sin (Pvt.) Ltd. for 137 MW Hydropower Project |
10-03-2015 | Decision of the Authority in the matter of Tariff Petition filed by Karimi Energy (Pvt.) Ltd. (KEPL) for Determination of Feasibility Stage Generation Tariff for its 3.6 MW Jabri Bedar Hydropower Project |
23-06-2025 | Notification S.R.O 1135(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated May 27,, 2025 along with revised tariff components attached as Annex-I regarding quarterly indexation/adjustment of tariff for January -March 2025 & April-June 2025 quarters on account of exchange rate variation, N-CPI local, US CPI and SOFR in respect of Karot Power Company (Pvt.) Limited | |
27-05-2025 | Decision ofthe Authority in the matter of Quarterly Indexation/Adjustment of the Tariff of 720 MW Karot Hydropower Project of Karot Power Company (Pvt) Ltd. | |
11-12-2024 | Notification S.R.O 2209(I)/2024 - NEPRA hereby notifies the Decision ofthe Authority dated November 19, 2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff for the quarter October - December 2024 | |
19-11-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of the Tariff of 720 MW Karot Hydropower Project of Karot Power Company (Pvt.) Ltd. | |
01-07-2024 | Notification S.R.O 1627(I)/2024 - NEPRA hereby notifies the Decision ofthe Authority dated September 10,2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff for the quarter July - September 2024 in respect of Karot Power Company (Pvt.)1 Limited | |
10-09-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of the Tariff of 720 MW Karot Hydropower Project of Karot Power Company (PYt.) Ltd. | |
01-07-2024 | Notification S.R.O 939(I)/2024- NEPRA hereby notifies the Decision of the Authority dated June 04, 2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff for the quarters January - March 2024 and April - June 2024 on account of Exchange Rate variation, N-CPI Local, US CPI and LIBOR in respect of Karot Power Company (Private) Limited | |
04-06-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of the Tariff of 720 MW Karot Hydropower Project of Karot Power Company (Pvt.) Ltd. (KPCL) | |
27-11-2023 | Notification S.R.O 1733(I)/2023- NIEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for the quarter October - December 2023 on account of Exchange Rate variation, N-CPI Local, US CPI and LIBOR in respect of Karot Power Company (Pvt.) Ltd. | |
03-11-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff of 720 MW Karot Hydropower Project of Karot Power Company (Pvt.) Ltd. | |
05-09-2023 | Notification S.R.O 1248(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for the quarter July to September 2023 on account of applicable variations in the Exchange Rate, LIBOR, US CPI and Local CPI in respect of Karot Power Company (Pvt.) Ltd. | |
11-08-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff of 720 MW Karot Hydropower Project of Karot Power Company (Pvt.) Ltd. | |
19-06-2023 | NOTIFICATION S.R.O 864(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for the quarters April-June 2022 to April - June 2023 on account of applicable variations in the Exchange Rate, LIBOR, US CPI and Local CPI in respect of Karot Power Company (Pvt.) Ltd. | |
29-05-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff of 720 MW Karot Hydropower Project of Karot Power Company (Pvt.) Ltd. | |
07-03-2023 | NOTIFICATION S.R.O 294(I)/2023-NEPRA hereby notifies the Decision of the Authority along-with revised tariff components regarding quarterly indexation/adjustment of tariff for the quarters April-June 2022 to October-December 2022 on account of Exchange Rate, LIBOR, US CPI and Local CPI variations in respect of Karot Power Company (Pvt.) Ltd | |
09-02-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff of 720 MW Karot Hydropower Project of Karot Power Company (Pvt.) Ltd. | |
17-07-2018 | Decision of the Authority in the matter of Motions for Leave for Review filed against Decision of the Authority in the matter of Induction of Security Cost for CPEC Projects in the Power Tariff to Ensure Security Sustainability | |
03-08-2017 | Decision of the Authority in the matter of Induction of Security Cost for the CPEC Projects in the Power Tariff to Ensure Security Sustainability | |
27-04-2016 | Decision of the Authority in the matter of Motion for Leave for Review filed by Karot Power Company (Pvt.) Ltd. (KPCL) against Determination of the Authority in the matter of EPC Stage Tariff of 720 MW Karot Hydropower Project | |
24-02-2016 | Determination of the Authority in the matter of Petition filed by Karot Power Company (Pvt.) Ltd. (KPCL) for Determination of EPC-Stage Generation Tariff in respect of 720-MW Karot Hydropower Project | |
11-12-2012 | Decision of the Authority in the matter of Motion for Leave for Review filled by Karot Power Company (Pvt) Ltd. (KPCL) 720 MW Karot Hydropower Project | |
29-05-2012 | Determination of the Authority in the matter of Tariff Petition filed by Karot Power Company Ltd. (KPCL) for approval of Feasibility Stage Tariff in respect of 720 MW Karot Hydropower Project |
05-06-2025 |
Notification S.R.O 1083(I)/2025 - , NHPRA hereby notifies the Decision of the Authority dated May 1.4, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter April - June 2025 on account of exchange rate variation, CPI local and IJS CPI |
|
14-05-2025 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
30-04-2025 | Decision of the Authority under NEPRA (Review Procedures Regulations, 2009 in the matter of Reimbursement of Pass-Through Withholding Tax (WHT) on Dividends for Laraib Energy Limited (LEL1 | |
20-03-2025 |
Notification S.R.O 399(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated February 26, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter January -March 2025 on account of exchange rate variation, CPI local, US CPI and LIBOR |
|
26-02-2025 | Decision ofthe Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
02-01-2025 |
Notification S.R.O 10(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated December 10, 2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter October - December 2024 on account of exchange rate variation, CPI local and US CPI |
|
10-12-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
29-10-2024 |
Notification S.R.O 1761(I)/2024 - NEPRA hereby notifiesthe Decision of the Authority dated September 26,2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter July - September 2024 on account of exchange rate variation, CPI local and US CPI |
|
13-09-2024 |
Notification S.R.O 1554(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated July 31, 2024 in the matter of reimbursement of 7:5% withholding tax on dividends for Laraib Energy Limited |
|
26-09-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
31-07-2024 | Decision of the Authority in the matter of Reimbursement of Pass-Through Withholding Tax on Dividends for Laraib Energy Limited (LEL) | |
02-07-2024 |
Notification S.R.O 941(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated June 05, 2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter April - June 2024 on account of exchange rate variation, CPI local, US CPI and LIBOR |
|
05-06-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
21-03-2024 |
Notification S.R.O 535(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated 29th February, 2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for January - March 2024 quarter on account of LIBOR, US CPI, CPI (General) and Exchange Rate |
|
29-02-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
02-02-2024 |
Notification S.R.O 168(I)/2024 - NEPRA hereby notifies the Decision of the Authority in the matter of Adjustment in Insurance component of the tariff of Laraib Energy limited for the period 23rd March 2023 to 22nd March 2024 |
|
12-01-2024 |
Notification S.R.O 37(I)/2024, NEPRA hereby notifies the Decision of the Authority in the matter of Quarterly Indexation/Adjustment of tariff for Laraib Energy limited for the period October 1, 2023 to December 31, 2023 on account of local O&M variable & fixed) |
|
21-12-2023 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of tariff for Laraib Energy limited for QTR OCT-DEC 2023 |
|
21-12-2023 |
Decision of the Authority in the matter of Adjustment in Insurance component of the tariff of Laraib Energy limited for March 2023-24 |
|
20-12-2023 |
Notification S.R.O 1837(I)/2023 , NEPRA hereby notifies the Decision of the Authority in the matter of revision of quarterly indexation/adjustment for quarters October - December 2020 to July September 2023 on account of local O&M (variable & fixed) and water use charges components of tariff of Laraib Energy Limited |
|
30-11-2023 |
Notification S.R.O 1744(I)/2023 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for ,July to September 2023 quarter on account of Exchange Rate variation, CPI Local. US CPI and IJBOR |
|
29-11-2023 | Decision of the Authority in the matter of revision of Quarterly Indexation/Adjustment for Quarters October-December 2020 to July-September 2023 on Account of Local O&M (Variable & Fixed) and Water Use Charges Components of Tariff of Laraib Energy Limited | |
21-11-2023 | Notification S.R.O 1670(I)/2023- NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for April - June, 2023 quarter on account of LIBOR, US CPI, CPI (General) and Exchange Rate | |
08-11-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
31-10-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
16-10-2023 | NOTIFICATION S.R.O 1445(I)/2023- NEPRA hereby notifies the Decision of the Authority along with schedule regarding reimbursement of 7.5% withholding tax on dividends in respect of Laraib Energy Limited | |
01-09-2023 | Decision of the Authority in the matter of Reimbursement of Pass-Through Withholding Tax on Dividends for Laraib Energy Limited (LEL) | |
19-06-2023 | NOTIFICATION S.R.O 865(I)/2023- NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter January 1, 2023 to March 31, 2023 on account of LIBOR, US CPI, CPI (General) and Exchange Rate | |
29-05-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
15-03-2023 | NOTIFICATION S.R.O 370(I)/2023- NEPRA hereby notifies the Decision of the Authority along with schedule regarding adjustment in insurance component of tariff for the period 23rd March 2022 to 22 March 2023 for Laraib Energy Limited | |
15-03-2023 | NOTIFICATION S.R.O 368(I)/2023-NEPRA hereby notifies the Decision of the Authority along with schedule regarding reimbursement of 7.5% withholding tax on dividends in respect of Laraib Energy Limited | |
22-02-2023 | NOTIFICATION S.R.O 219(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter October 1, 2022 to December 31, 2022 | |
01-02-2023 | Decision of the Authority in the matter of Adjustment in Insurance Component of Tariff for Laraib Energy Limited | |
01-02-2023 | Decision of the Authority in the matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Limited | |
01-02-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
22-11-2022 | NOTIFICATION S.R.O. 2056 (I)/2022- NEPRA hereby notifies the Decision of the Authority regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter July 1, 2022 to September 30, 2022 | |
16-11-2022 | S.R.O. 2102(I)/2022 - NEPRA hereby notifies the decision of the Authority along with schedule regarding reimbursement of 7.5% withholding tax on dividends in respect of Laraib Energy Limited | |
28-10-2022 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
18-10-2022 | S.R.O. 2161(I)/2022 - NEPRA hereby notifies the decision of the Authority along with schedule regarding adjustment in insurance component of tariff for the period 23rd March 2021 to 22nd March 2022 for Laraib Energy Ltd. | |
04-10-2022 | Decision of the Authority in the matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Limited | |
07-09-2022 | S.R.O. 1730(I)/2022-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter April 1,2022 to June 30,2022 | |
22-08-2022 | S.R.O. 1584(I)/2022-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter October December 2021 | |
22-08-2022 | S.R.O. 1583(I)/2022-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter January March 2022 | |
01-08-2022 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Laraib Energy Limited | |
22-07-2022 | Decision of the Authority in the matter of Adjustment in Insurance Component of Tariff for Laraib Energy Limited | |
07-07-2022 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
05-07-2022 | S.R.O. 996 (I)2022-NEPRA hereby notifies the Decision of the Authority in the matter of Motion for Leave for Review against the Authority's Decision in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
05-07-2022 | S.R.O. 999 (I)2022-NEPRA hereby notifies the decision of the Authority along with schedule regarding reimbursement of 7.5% withholding tax on dividends in respect of Laraib Energy Ltd. | |
05-07-2022 | S.R.O. 1000 (I)2022-NEPRA hereby notifies the decision of the Authority along with schedule regarding adjustment in insurance component of tariff for the period 23rd March 2020 to 22 March 2021 for Laraib Energy Ltd. | |
05-07-2022 | S.R.O. 1002 (I)2022-NEPRA hereby notifies the decision of the Authority along with schedule regarding reimbursement of 7.5% withholding tax on dividends in respect of Laraib Energy Limited | |
24-06-2022 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
09-06-2022 | S.R.O. 1056 (I)2022-NEPRA hereby notifies the decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter July-September 2021 on account of KIBOR/LIBOR, US CPI, CPI (General) and Exchange Rate | |
08-06-2022 | S.R.O. 875 (I)2022-NEPRA hereby notifies the decision of the Authority along with revised tariff componerts regarding quarterly indexation/adjustment of tariff of Laraib Energy Limited for the quarter April -June 2021 on account of KIBOR/LIBOR, US CPI, CPI (General) and Exchange Rate | |
26-05-2022 | Decision of the Authority in the matter of Motion for Leave for Review against the Authority's Decision in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
16-03-2022 | Decision of the Authority in the matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Limited | |
24-12-2021 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
17-08-2021 | Decision of the Authority in the matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Limited | |
17-08-2021 | Decision of the Authority in the matter of Adjustment in Insurance Component of Tariff for Laraib Energy Limited | |
03-06-2021 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Laraib Energy Limited | |
10-03-2021 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Laraib Energy Limited | |
01-03-2021 | Decision of the Authority in the matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Limited | |
06-01-2021 | Decision of the Authority in the matter of Motion for Leave for Review submitted by Laraib Energy Limited (LEL) against the Decision of the Authority in the matter of Quarterly Indexation / Adjustment of Tariff of Debt Servicing Component | |
30-12-2020 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Laraib Energy Limited | |
20-08-2020 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Laraib Energy Limited | |
04-06-2020 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Laraib Energy Limited | |
28-04-2020 | Decision of the Authority in the Matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Limited | |
06-04-2020 | Decision of the Authority in the matter of Adjustment in Insurance Component of Capacity Charge Part of Tariff for Laraib Energy Limited | |
13-02-2020 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Laraib Energy Limited | |
13-11-2019 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Laraib Energy Limited | |
05-11-2019 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Laraib Energy Limited | |
01-11-2019 | Decision of the Authority in the Matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Limited | |
29-08-2019 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
13-05-2019 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Limited | |
04-04-2019 | Decision of the Authority in the Matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Ltd | |
18-03-2019 | Decision of the Authority in the matter of Adjustment in Insurance Component of Capacity Charge Part of Tariff for Laraib Energy Limited | |
13-03-2019 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
02-11-2018 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
27-08-2018 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
17-08-2018 | Decision of the Authority in the Matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Ltd | |
24-05-2018 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
16-02-2018 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
08-01-2018 | Decision of the Authority in the matter of Adjustment in Insurance Component of Capacity Charge Part of Tariff for Laraib Energy Ltd | |
23-11-2017 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
13-10-2017 | Decision of the Authority in the Matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Ltd | |
26-09-2017 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
19-05-2017 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
16-03-2017 | Decision of the Authority in the Matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Ltd | |
15-02-2017 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
06-01-2017 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd for the quarter October — December 2016 | |
28-12-2016 | Decision of the Authority in the matter of Adjustment in Insurance Component of Capacity Charge Part of Tariff for Laraib Energy Ltd for the period 23rd March 2016 to 22nd March 2017 | |
27-12-2016 | Corrigendum - Decision of the Authority in the matter of Adjustment in Insurance Component of Capacity Charge Part of Tariff for Laraib Energy Ltd dated 01.12.2016. | |
01-12-2016 | Decision of the Authority in the matter of Adjustment in Insurance Component of Capacity Charge Part of Tariff for Laraib Energy Ltd | |
19-10-2016 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
05-09-2016 | Decision of the Authority in the Matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Ltd | |
15-07-2016 | Decision of the Authority in the Matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Ltd | |
30-06-2016 | Decision of the Authority in the Matter of Motion for Leave for Review filed by Laraib Energy Ltd (LEL) against the Authority's COD Tariff Adjustment Decision | |
28-06-2016 | Decision of the Authority in the Matter of Reimbursement of Pass Through Withholding Tax on Dividends for Laraib Energy Ltd | |
26-05-2016 | Decision of the Authority in the matter of Motion for Recalculation filed by Laraib Energy Ltd (LEL) against the Decision of the Authority for Tariff Adjustment at Commercial Operation Date of LEL | |
14-04-2016 | Decision of the Authority in the matter of Tariff Adjustment at Commercial Operation Date of 84 MW New Bong Escape Hydropower Project — Laraib Energy Ltd (LEL) | |
04-03-2016 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
12-11-2015 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
03-09-2015 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
09-07-2015 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
02-06-2015 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Enemy Ltd | |
04-03-2015 | Corrigendum - Decisions of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd | |
04-03-2015 | Decision of the Authority in the Matter of Request of Interim Relief for Laraib Energy Ltd. | |
02-03-2015 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd. | |
25-11-2014 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd. | |
21-10-2014 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd. | |
02-10-2014 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff for Laraib Energy Ltd. | |
14-12-2009 | Decision of the Authority for power procurement between CPPA and Laraib Energy Ltd |
09-07-2019 | Decision of the Authority in the matter of Motion for Leave for Review against Determination of the Authority in the matter of application for Approval of Tariff by Master Hydro Power (Private) Ltd. for its 99 MW Arkari GOL Hydro Power Project located at Arkari GOL, District Chitral, KPK | |
22-10-2018 | Decision of the Authority in the matter of Approval of Tariff for Master Hydro Power (Pvt) Ltd. for its 99 MW Hydroelectric Power Plant at District Chitral, KPK |
13-02-2009 | Authority's Decision on the Central Power Purchasing Agency's Request for the Procurement of Power from Mira Pakistan Ltd. - Kotli Hydropower Project |
18-06-2025 | Notification S.R.O 1066(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated May 22, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff of 102 MW Gulpur Hydro power project of Mira Power Limited for die quarter April - June 2025 on account of US CPI, N-CPI, exchange rate and SOFR variation | |
22-05-2025 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff of 102 MW Gulpur Hydro Power Project of Mira Power Limited. | |
26-03-2025 | Notification S.R.O 496(I)/2025 - NEPRA hereby notifies the Decision of the-Authority dated March 04, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff of 102 MW Gulpur Hydro power project of Mira Power Limited for the quarter January - March 2025 on account of US CPI, N-CPI, exchange rate and SOFR variation | |
22-01-2025 | Notification S.R.O 63(I)/2025 - NEPRA hereby notifies the decision of the Authority dated December 31,2024 in the matter of Quarterly Indexation/Adjustment of tariff of 102 MW Gulpur Hydro power project of Mira Power Limited for the quarter October - December 2024 provisionally to the extent of applicable exchange rate variation, N-CPI local, US CPI and LIBOR | |
31-12-2024 | Decision of the Authority in the Matter of Quarterly Indention/Adjustment of Tariff of 102 MW Gulpur Hydro Power Project of Mira Power Limited. | |
23-09-2024 | Notification S.R.O 1515(I)/2024 - NEPRA hereby notifies the decision of the Authority dated August 29,2024 in the matter of Quarterly Indexation/Adjustment of tariff of 102 MW Gulpur Hydro power project of Mira Power Limited for the quarter July - September 2024 provisionally to the extent of applicable exchange rate variation, N-CPI local, US CPI and LIBOR | |
29-08-2024 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff of 102 MW Gulpur Hydro Power Project of Mira Power Limited. | |
27-06-2024 | Notification S.R.O 922(I)/2024 - NEPRA hereby notifies the decision of the Authority dated March 14, 2024 in the matter of Quarterly Indexation/Adjustment of tariff of 102 MW Gulpur Hydro power project of Mira Power limited for the quarter January - March 2024' on account of fixed and variable O&M (Local) components | |
31-05-2024 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff of 102 MW Gulpur Hydro Power Project of Mira Power Limited | |
04-04-2024 | Notification S.R.O 609(I)/2024 - NEPRA hereby notifies the decision of the Authority dated March 14, 2024 in the matter of Quarterly Indexation/Adjustment of tariff of 102 MW Gulpur Hydro power project of Mira Power limited for the quarter January - March 2024' on account of fixed and variable O&M (Local) components | |
14-03-2024 | Decision of the Authority in the Matter of Quarterly Indexation/Adjustment of Tariff of 102 MW Gulpur Hydro Power Project of Mira Power Limited. | View |
12-01-2024 | Notification S.R.O 36(I)/2024 - NEPRA hereby notifies the 'Decision of the Authority in the matter of Quarterly Indexation/Adjustment of1arjffof102 MW Gulpur Hydro Power project of Mira Power limited for October - December 2023' on account of fixed and variable O&M (Local) components | |
12-01-2024 | Notification S.R.O 35(I)/2024 - NEPRA hereby notifies the Decision of the Authority in the matter of Quarterly Indexation/Adjustment of tariff of 102 MW Gulpur 1-lydro power project of Mira Power limited for October - December 2020 to July - September 2023 quarters on account of local O&M and Water Use Charge components | |
21-11-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of tariff of 102 MW Gulpur Hydro power project of Mira Power limited for QTR OCT-DEC 2023 | |
21-11-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of tariff of 102 MW Gulpur Hydro power project of Mira Power limited for QTR OCT-DEC 2020 TO JUL-SEP 2023 | |
13-11-2023 | NOTIFICATION S.R.O 1561(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of 102 MW Gulpur Hydro Power Project of Mira Power Limited for April to September 2023 quarters to extent of applicable exchange rate variation. N-CPI local, US CPI and LIBOR | |
22-02-2023 | NOTIFICATION S.R.O 218(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of 102 MW Gul pur Hydro Power Project of Mira Power Limited for the quarter October 1, 2022 to December 31, 2022 | |
10-02-2009 | Authority's Decision on the Central Power Purchasing Agency's Request for the Procurement of Power from Mira Power Ltd. - Gulpur Hydropower Project |
06-04-2016 | Determination of the Authority in the Matter of Tariff Petition filed by Olympus Energy (Pvt.) Ltd. for its 20 MW Lucky Hydropower Project | |
14-12-2012 | Determination of the Authority in the Matter of Tariff Petition filed by Olympus Energy (Pvt.) Ltd for Determination of Feasibility Stage Reference Tariff i.r.o. 20 MW Hydropower Project at Maral Barrage Gujrat. | |
03-01-2011 | Determination of the Authority in the Matter of Tariff Petition filed by Olympus Energy (Pvt.) Ltd. |
26-02-2025 | Notification S.RO. 213(I)/2025-NEPRA hereby notifies the Decision of the Authority dated 13th January, 2025 regarding Suo Moto Proceedings for change in COD of 36.6 MW Daral Khawar Hydropower Protect of PEDO | view |
13-01-2025 | Decision of the Authority regarding Suo Moto Proceedings for change in COD of 36.6MW Daral Khawar Hydropower Project of PEDO | view |
05-07-2022 | S.RO. 997(I)/2022-NEPRA hereby notifies the Determination of the Authority in the matter of Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for 36.6 MW Daral Khawar Hydropower Project located at District Sawat of Khyber Pakhtunkwa Province | view |
16-05-2022 | Determination of the Authority in the matter of Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for 36.6 MW Daral Khawar Hydropower Project located at District Sawat of Khyber Pakhtunkwa Province | view |
09-01-2018 | Determination of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization for Determination of EPC Stage Generation Tariff for 36.6 MW Daral Khawar Hydropower Project located in District Sawat, Malakand Division, Khyber Pakhtunkwa | view |
24-01-2025 |
Notification S.RO. 62(1)/2025 - NEPRA hereby notifies the decision of the Authority dated December 11, 2024 in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) for Tariff Determination of 84 MW Gorkin Matiltan Hydropower Project | |
11-12-2024 |
Decision of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) for Tariff Determination of84 MW Gorkin Matiltan Hydropower Project |
27-05-2022 |
S.RO. 742(1)/2022-NEPRA hereby
notifies the Decision of the Authority in the
matter of Motion for Leave for Review filed by
Pakhtunkhwa Energy Development Organization (PEDO)
for 10.2 MW Jabori Hydropower Project |
|
11-11-2021 |
Decision of the Authority in
the matter of Motion for Leave for Review filed
by Pakhtunkhwa Energy Development Organization (PEDO)
for 10.2 MW Jabori Hydropower Project |
|
30-12-2020 |
Decision of the Authority in
the matter of Tariff Petition filed by
Pakhtunkhwa Energy Development Organization (PEDO)
for Tariff Determination of 10.2 MW Jabori
Hydropower Project |
27-05-2022 | S.RO. 740(1)/2022-NEPRA hereby notifies the Decision of the Authority in the matter of Motion for Leave for Review filed by Pakhtunkhwa Energy Development Organization (PEDO) for 11.8 MW Karora Hydropower Project | view |
11-11-2021 | Decision of the Authority in the matter of Motion for Leave for Review filed by Pakhtunkhwa Energy Development Organization (PEDO) for 11.8 MW Karora Hydropower Project | view |
08-02-2021 | Decision of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) for Tariff Determination of 11.8MW Karora Hydropower Project | view |
27-05-2022 | S.RO. 741(1)/2022-NEPRA hereby notifies the Decision of the Authority in the matter of Motion for Leave for Review filed by Pakhtunkhwa Energy Development Organization (PEDO) for 40.8 MW Koto Hydropower Project | view |
11-11-2021 | Decision of the Authority in the matter of Motion for Leave for Review filed by Pakhtunkhwa Energy Development Organization (PEDO) for 40.8 MW Koto Hydropower Project | view |
10-03-2021 | Decision of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) for Tariff Determination of 40.8 MW Koto Hydropower Project | view |
29-11-2021 | Decision of the Authority in the matter of Motion for Leave for Review filed by Pakhtunkhwa Energy Development Organization (PEDO) for 69 MW Lawi Hydropower Project | view |
15-03-2021 | Decision of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) for Tariff Determination of 69 MW Lawi Hydropower Project | view |
17-11-2022 | NOTIFICATION S.R.O. 2166 (I)/2022 - NEPRA hereby notifies the Decision of the Authority in the matter of Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 18 MW Pehur Hydropower Project | view |
06-10-2022 | Decision of the Authority in the matter of Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 18 MW Pehur Hydropower Project | view |
06-12-2010 | Determination in the matter of 18MW Pehur Hydropower Project of Sarhad Hydel Development Organization (SHYDO) |
06-04-2023 | NOTIFICATION S.R.O 459(I)/2023-NEPRA hereby notifies the Decision of the Authority in the matter of Motion for Leave for Review filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 1.875 MW Shishi Hydropower Project | |
22-02-2023 | Decision of the Authority in the matter of Motion for Leave for Review filed by Pakhtunkhwa Energy Development Organization (PEDO) for its 1.875 MW Shishi Hydropower Project | |
22-10-2021 | Decision of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Energy Development Organization (PEDO) in respect of 1.875 MW Shishi Hydropower Plant at Chitral |
06-06-2022 | NOTIFICATION S.R.O. 721 (I)2022 - DETERMINATION IN THE MATTER OF PETITION FOR TARIFF MODIFICATION FILED BY PAKHTUNKHWA ENERGY DEVELOPMENT ORGANIZATION (PEDO) FOR 2.6 MW MACHAI HYDROPOWER PROJECT LOCATED AT DISTRICT MARDAN, KHYBER PAKHTUNKHA PROVINCE | view |
24-02-2022 | Determination of the Authority in the matter of Petition for Tariff Modification filed by Pakhtunkhwa Energy Development Organization (PEDO) for 2.6 MW Machai Hydropower Project located at District Mardan, Khyber Pakhtunkhwa Province | view |
23-07-2014 | Decision of the Authority in the matter of Motion for Leave for Review filed by Pakhtunkhwa Hydel Development Organization for its Machai Hydropower Project against Tariff Determination dated March 14, 2014 | view |
14-03-2014 | Determination of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Hydel Development Organization for its Machai Hydropower Project | View |
13-01-2014 | Decision of the Authority in the Matter of Motion for Leave for Review filed by Pakhtunkhwa Energy Development Organization (formerly Pakhtunkhwa Hydel Development Organization) for its Ranolia Hydropower Project against Tariff Determination dated April 29, 2013 | view |
29-04-2014 | Determination of the Authority in the matter of Tariff Petition filed by Pakhtunkhwa Hydel Development Organization for its Ranolia Hydropower Project | view |
01-07-2011 | Decision of the Authority in the matter of Motion for Leave for Review filed by Punjnad Hydropower (Pvt.) Ltd. against tariff Determination of the Authority dated December 08, 2010. | view |
08-12-2010 | Determination of the Authority in the matter of Tariff Petition filed by Punjnad Hydropower (Pvt.) Ltd. | view |
06-06-2022 |
NOTIFICATION S.R.O. 719 (I)2022 - DETERMINATION
IN THE MATTER OF PETITION FOR TARIFF MODIFICATION FILED BY
PUNJAB POWER DEVELOPMENT COMPANY (PPDCL) FOR 4.04 MW DEG-OUTFALL
HYDROPOWER PROJECT AT UPPER CHENAB CANAL, SHEIKHUPURA, PUNJAB |
|
17-02-2022 |
Determination of the Authority in the matter of
Petition for Tariff Modification filed by Punjab Power
Development Company Ltd. (PPDCL) for 4.04 MW Deg-Outfall
Hydropower Project at Upper Chenab Canal, Sheikhupura, Punjab |
|
05-05-2016 |
Determination of the Authority in the matter of
Tariff Petition filed by Punjab Power Development Company Limited
for its Deg-outfall Hydropower Project |
16-05-2025 | Notification S.R.O. 833(I)2024 - NEPRA hereby notifies the Decision of the Authority dated April 23, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff components of Chianwali Hydropower Project of Punjab Power Development Company Limited for the Quarter April - June 2025 on account ofUS CPI, N-CPI (Local), Exchange Rate (PKRjpSD/JPY) and LIBOR variations | view |
23-04-2025 | Decision ofthe Authority in the matter of Quarterly Indexation of Tariff Components of Chianwali Hvdropower Project of Punjab Power Development Company Limited | view |
26-03-2025 | Notification S.R.O. 499(I)2024 - NEPRA hereby notifies the Decision of the Authority dated March 04, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff components of Chianwali Hydropower Project of Punjab Power Development Company Limited for the Quarter January - March 2025 on account of US CPI, N-CPI, Exchange Rate (PKR/USD/JPY) and LIBOR variations | view |
04-03-2025 | Decision of the Authority in the matter of Quarterly Indexation of Tariff Components of Chianwali Hydropower Project of Punjab Power Development Company Limited | view |
06-11-2024 | Decision of the Authority in the mailer of Quarterly Indexation of Tariff Components of Chianwali Hydropower Project of Puniab Power Development Company Limited | view |
02-09-2024 | Notification S.R.O. 1419(I)2024 - NEPRA hereby notifies the Decision of the Authority dated August 8, 2024 along with revised tariff components regarding the Quarterly Indexation of the Chianwali Hydropower Project of Punjab Power Development Company Limited for the Quarter July-September 2024 on account of US CPI, N-CPI, Exchange Rate and LIBOR variations | view |
08-08-2024 | Decision of the Authority in the matter of Quarterly Indexation of the relevant Reference Tariff Components of Chianwali Hydropower Project of Punjab Power Development Company Limited | view |
02-07-2024 | Notification S.R.O. 944(I)2024 - NEPRA hereby notifies the decision of the Authority dated June 05, 2024 regarding the Quarterly Indexation of the Chianwali Hydropower Project of Punjab Power Development Company Limited for the Quarters July-September 2023 to April-June 2024 on account of US CPI, N-CPI, Exchange Rate and LIBOR Yen variations | view |
05-06-2024 | Decision of the Authority in the matter of Quarterly Indexation of the relevant Reference Tariff Components of Chianwali Hydropower Project of Pun jab Power Development Company Limited | view |
06-06-2022 | NOTIFICATION S.R.O. 718 (I)2022 - DETERMINATION IN THE MATTER OF PETITION FOR TARIFF MODIFICATION FILED BY PUNJAB POWER DEVELOPMENT COMPANY (PPDCL) FOR 5.38 M\V CHIANWALI HYDROPOWER PROJECT AT CHIANWALI, GUJRANWALA, PUNJAB | view |
11-04-2021 | Determination of the Authority in the matter of Petition for Tariff Modification filed by Punjab Power Development Company Ltd. (PPDCL) for 5.38 MW Chianwali Hydropower Project at Chianwali, Gujranwala, Punjab | view |
02-08-2016 | Determination of the Authority in the matter of Tariff Petition filed by Punjab Power Development Company Limited for its Chianwali Hydropower Project | view |
16-05-2025 | Notification S.R.O 832(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated April 23, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff components of Marala Hydropower Project of Punjab Power Development Company Limited for thejguarter April - June 2025 on account of US CPI, N-CPI (Local), exchange rate (PKRSjSD/JPX) and LIJ30R variations | |
23-04-2025 | Decision of the Authority in the matter of Quarterly Indexation of Tariff Components of Marala Hydropower Protect of Punjab Power Development Company Limited | view |
26-03-2025 | Notification S.R.O 498(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated March 04, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff components of Marala Hydropower Project of Punjab Power Development Company Limited for the quarter January - March 2025 on account of US CPI, N-CPI (Local), exchange rate (PKR/USD/JPY) and LIBOR variations | |
04-03-2025 | Decision of the Authority in the matter of Quarterly Indexation of Tariff Components of Marala Hydropower Project of Punjab Power Development Company Limited | view |
06-11-2024 | Decision of the Authority in the mailer of Quarterly Indexation of Tariff Components of Marala Hydropower Project of Punjab Power Development Company Limited | view |
26-08-2024 | Notification S.R.O 1364(I)/2024 - NEPRA hereby notifies the decision of the Authority dated July 31, 2024regarding the Quarterly Indexation of the Marala Hydropower Project of Punjab Power Development Company Limited for the quarter July-September 2024 on account of US CPI, N-CP1 (Local), exchange rate (PKR/USD/JPY) and LIBOR variations | |
31-07-2024 | Decision of the Authority in the matter of Quarterly Indexation of Tariff Components of Marala Hydropower Project of Punjab Power Development Company Limited | view |
02-07-2024 | Notification S.R.O 943(I)/2024 - NEPRA hereby notifies the decision of the Authority dated June 05, 2024 regarding the Quarterly Indexation of the Marala Hydropower Project of Punjab Power Development Company Limited for the Quarters July-September 2023 to April-June 2024 on account of US CPI, N-CPI, Exchange Rate and LIBOR Yen variations | |
05-06-2024 | Decision of the Authority in the matter of Quarterly Indexation of the relevant Reference Tariff Components of Marala Hydropower Project of Punjab Power Development Company Limited | view |
23-11-2016 | Decision of the Authority in the matter of Motion for Leave for Review filed by M/s. Punjab Power Development Company Ltd. for its Marala Hydropower Project against Tariff Determination Dated June 30, 2015 | view |
12-02-2015 | Determination of the Authority in the Matter of Tariff Petition filed by Punjab Power Development Company Ltd. for its Marala Hydropower Project | view |
16-05-2025 | Notification S.R.O 831(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated April 23, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff components of Pak Pattan Hydropower Project of Punjab Power Development Company Limited for the quarter April - June 2025 on account of US CPI, N-CPI (Local), exchange rate (PKR/USD/JPY) and LIBOR variations | |
23-04-2025 | Decision ofthe Authority in the matter of Quarterly Indexation of tariff Components of Pak Pattan Hydropower Project of Punjab Power Development Company Limited | |
26-03-2025 | Notification S.R.O 497(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated March 04, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff components of Pak Pattan Hydropower Project of Punjab Power Development Company Limited for the quarter January - March 2025 on account of 'US CPI, N-CPI (Local), exchange rate (PKR/USD/JPY) and LIBOR variations | |
04-03-2025 | Decision of the Authority in the matter of Quarterly Indexation of tariff Components of Pak Pattan Hydropower Project of Punjab Power Development Company Limited | |
28-11-2024 | Notification S.R.O 1974(I)/2024 - NEPRA hereby notifies the decision of the Authority dated November 06, 2024 regarding the Quarterly Indexation of the Pak Paftan Hydropower Project of Punjab Power Development Company Limited for the quarter October - December 2024 | |
06-11-2024 | Decision of the Authority in the matter of Quarterly Indexation of tariff Components of Pak Pattan Hydropower Project of Pun jab Power Development Company Limited | |
26-08-2024 | Notification S.R.O 1363(I)/2024 - NEPRA hereby notifies the decision of the Authority dated July 31, 2024 regarding the Quarterly Indexation of the Pak Pattan Hydropower Project of Punjab Power Development Company Limited for the quarter July-September 2024 on account of US CPI, N-CPI (Local), exchange rate (PKR/USD/JPY) and LIBOR variations | |
31-07-2024 | Decision of the Authority in the matter of Quarterly Indexation of tariff Components of Pak Pattan Hydropower Project of Pun jab Power Development Company Limited | |
02-07-2024 | Notification S.R.O 942(I)/2024 - NEPRA hereby notifies the decision of the Authority dated June 05, 2024 regarding the Quarterly Indexation of the Pak Pattan Hydropower Project of Punjab Power Development Company Limited for the Quarters July-September 2023 to April-June 2024 on account of US CPI, N-CPI, Exchange Rate and LIBOR Yen variations i | |
05-06-2024 | Decision of the Authority in the matter of Quarterly Indexation of the relevant Reference tariff Components of Pak Pattan Hydropower Project of Pun jab Power Development Company Limited | |
08-02-2016 | Decision of the Authority in the Matter of Motion for Leave for Review filed by Punjab Power Development Company Ltd. for its Pakpattan Hydropower Project against Determination Dated February 4, 2015 | |
04-02-2015 | Determination of the Authority in the Matter of Tariff Petition filed by Punjab Power Development Company Ltd. for its Pakpattan Hydropower Project |
17-05-2013 | Decision of the Authority in the Matter of Government of Sindh Request with respect to Development of 2.5 - 3 MW Power Project — Existing Fall Regulator RD 15 at Rohri Canal |
14-06-2018 | Decision of the Authority in the matter of Approval of Tariff for Saifco Hydropower Ltd. | view |
19-07-2016 | Determination of the Authority in the matter of Tariff Petition filed by Sammar Gah Hydro (Private) Ltd. |
17-07-2020 | Decision of the Authority in the matter of Tariff Proposal submitted by Sapphire Hydropower Private Limited for 150 MW Sharmai Hydropower Project |
18-06-2025 |
Notification S.R.O 1067(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated May 22, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Limited for die April - June 2025 quarter on account of US CPI, N-CPI, exchange rate and SOFR variation |
|
22-05-2025 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Limited (SHPL) |
|
28-04-2025 |
Notification S.R.O 744(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated March 27, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Limited for the July - September 2024, October -December 2024 and January -March 2025 quarters on account of US CPI, N-CPI, exchange rate and SOFR variation |
|
27-03-2025 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Protect of Star Hydro Power Limited (SHPL) |
|
20-09-2024 |
Notification S.R.O 1531(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated August 07, 2024 in the matter of tariff modification petition filed by Central Power Purchasing Agency (CPPA-G) for exclusion of principle debt damages from Star Hydropower Limited (147 MW Patrind Hydropower Project) located at district Muzaffarabad |
|
27-08-2024 |
Notification S.R.O 1369(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated 10th July, 2024 in the matter of adjustment in insurance component for the 147 MW Patrind Hydropower Project of Star Hydro Power Limited for the period November 08, 2023 to November 07, 2024 |
|
07-08-2024 |
Decision of National Electric Power Regulatory Authority in the matter of Tariff modification Petition filed by Central Power Purchasing Agency Guarantee Limited (CPPA-G) for exclusion of Principle Debt Damages from Star Hydropower Limited (SHPL) (147 MW Patrind Hydropower Project) Located at District Muzaffarabad. (AJ&K). |
|
10-07-2024 |
Decision of the Authority in the matter of Adjustment in the Insurance Component for the 147 MW Patrind Hydropower Project of Star Hydropower Limited |
|
03-07-2024 |
Notification S.R.O 946(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated June 6, 2024 along with Indexation regarding quarterly indexation/adjustment of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Limited for April - June 2024 quarter on account Exchange Rate variation, N-CPI Local, US CPI and LIBOR variation |
|
14-06-2024 |
Notification S.R.O 905(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated 02-05-2024 in the matter of Motion for Leave for Review filed by Star Hydro Power Limited against NEPRA's Decision in the matter of 147 MW Patrind Hydropower Project dated July 29, 2020 |
|
03-06-2024 |
Notification S.R.O 855(I)/2024 - NEPRA hereby notifies the Decision of the Authority dated 1 8th April, 2024 in the matter of adjustment in insurance component for the 147 MW Patrind Hydropower Project of Star Hydro Power Limited for the period November 08, 2022 to November 07, 2023 |
|
06-06-2024 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project (Star Hydro Power Limited) |
|
02-05-2024 |
Decision of the Authority in the matter of Motion for Leave for Review Filed by Star-Hydro Power Limited (SHPL) against NEPRA's Decision in the matter of 147 MW Patrind Hydropower Project Dated July 29, 2020 |
|
18-04-2024 |
Decision of the Authority in the matter of Adjustment in the Insurance Component for the 147 MW Patrind Hydropower Project (Star Hydro Power Ltd.) |
|
21-03-2024 |
NOTIFICATION S.R.O 536(I)/2024-NEPRA hereby notifies the Decision of the Authority dated February 29, 2024 along with Indexation regarding quarterly indexation/adjustment of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. for January - March 2024 quarter on account Exchange Rate variation, N-CPI Local, US CPI and LIBOR variation |
|
29-02-2024 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project (Star Hydro Power Limited) |
|
05-12-2023 |
NOTIFICATION S.R.O 1816(I)/2023-NEPRA hereby notifies the Decision of the Authority along with Indexation regarding quarterly indexation/adjustment of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. for October - December 2023 quarter on account Exchange Rate variation, N-CPI Local, US CPI and LIBOR variation |
|
14-11-2023 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project (Star Hydro Power Limited) |
|
13-11-2023 |
NOTIFICATION S.R.O 1562(I)/2023-NEPRA hereby notifies the Decision of the Authority along with Indexation regarding quarterly indexation/adjustrnent of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. for July .- September 2023 quarter on account Exchange Rate variation, N-CPI Local, US CPI and LIBOR variation |
|
19-10-2023 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project (Star Hydro Power Limited) |
|
09-06-2023 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. |
|
11-05-2023 | NOTIFICATION S.R.O 593(I)/2023-NEPRA hereby notifies the Decision of the Authority along with Indexation regarding quarterly indexation/adjustment of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. for the quarter January 01, 2023 to March 31, 2023 on account of US CPI, CPI (Local/General), US$ / PKR Exchange Rate and LIBOR variation in Case No. NEPRAJTRF-172/SHPL-2011 | |
20-04-2023 |
Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. | |
15-03-2023 | NOTIFICATION S.R.O 369(I)/2023-NEPRA hereby notifies the Decision of the Authority in the matter of adjustment in insurance component for the 147 MW Patrind Hydropower Project of Star Hydro Power Ltd | |
14-03-2023 | NOTIFICATION S.R.O 362(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd | |
21-02-2023 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd | |
01-02-2023 | Decision of the Authority in the matter of Adjustment in the Insurance Component for the 147 MW Patrind Hydropower Project (Star Hydro Power Ltd.) | |
28-10-2022 | Notification S.R.O. 1966(I)/2022 - NEPRA hereby notifies the decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. for the quarter July September 2022 on account of US CPI, CPI (Local/General), US$ / PKR Exchange Rate Variation and LIBOR | |
20-10-2022 | Notification S.R.O. 1949 (I)/2022 - NEPRA hereby notifies the decision of the Authority in the matter of Application for Recovery of Sales Tax on Construction Services and O&M Services Imposed by Govt. of AJ&K - Star Hydro Power Limited (SHPL) 147 MW Patrind Hydro Power Project | |
19-09-2022 | Notification S.R.O. 1799(I)/2022 - Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. | |
16-09-2022 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. | |
30-08-2022 | Decision of National Electric Power Regulatory Authority in the matter of Application for Recovery of Sales Tax on Construction Services and O& M Services Imposed by Govt. of AJ&K - Star Hydro Power Limited (SHPL) - 147 MW Patrind Hydro Power Project f | |
17-08-2022 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. | |
17-02-2022 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for 147 MW Patrind Hydropower Project of Star Hydro Power Ltd. | |
29-07-2020 | Decision of the Authority in the matter of Tariff Adjustments at Commercial Operation Date (COD) of 150 MW Patrind Hydropower Project | |
15-06-2020 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Star Hydro Power Ltd | |
10-06-2022 | NOTIFICATION S.R.O. 1160 (I)/2022 - NEPRA hereby notifies the decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Star Hydro Power Ltd. for the quarters falling in the period from January 2018 to September 2021 on account of US CPI, CPI (Local/General). LIBOR and US $/ PKR Exchange Rate Variation | |
10-06-2022 | NOTIFICATION S.R.O. 1148 (I)/2022 - NEPRA hereby notifies the decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff of Star Hydro Power Ltd. for the quarters falling in the period from January 2018 to September 2021 on account of US CPI, CPI (Local/General). LIBOR and US $ / PKR Exchange Rate Variation | |
09-06-2020 | Decision of National Electric Power Regulatory Authority in the matter of Petition for Modification of EPC Reference Tariff filed by Central Power Purchasing Agency Guarantee Limited (CPPA-G) for 147 MW Patrind Hydro Power Project | |
22-08-2019 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Star Hydro Power Ltd | |
04-04-2019 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Star Hydro Power Ltd. | |
27-01-2012 | Decision of the Authority in the matter of Request filed by Central Power Purchasing Agency (CPPA) for Approval of Negotiated Tariff regarding Procurement of Power from Star Hydropower (Pvt.) Ltd. 150 MW Patrind Hydropower Project | |
13-02-2009 | Authority's Decision on the Central Power Purchasing Agency's Request for the Procurement of Power from Star Hydropower Ltd. - Patrind Hydropower Project |
07-07-2025 | Decision of the Authority in the matter of Review motion filed by Suki Kinari Hydropower Limited against the Decision of the Authority dated January 02. 2025 regarding Quarterly Indexations | |
07-04-2025 | Notification S.R.O 573(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated March 11, 2025 along with revised tariff components regarding quarterly indexation/adjustment oftariff of Suki Kinari Hydropower Project for the quarter January - March 2025 on account of SOFR and Exchange Rate variation | |
11-03-2025 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff-884 MW Suki Kinari Hydropower Project | |
24-01-2025 | Notification S.R.O 56(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated January 02, 2025 along with revised tariff components regarding quarterly indexation/adjustment of tariff of Suki Kinari Hydropower Project for the quarters July-December 2024 on account of N-CPI (General), US CPI, Exchange Rate and LIBOR variations | |
02-01-2025 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff-884 MW Suki Kinari Hydropower Project for Quarters July-December 2024 | |
17-07-2018 | Decision of the Authority in the matter of Motions for Leave for Review filed against Decision of the Authority in the matter of Induction of Security Cost for CPEC Projects in the Power Tariff to Ensure Security Sustainability | |
03-08-2017 | Decision of the Authority in the matter of Induction of Security Cost for the CPEC Projects in the Power Tariff to Ensure Security Sustainability | |
22-07-2014 | Decision of the Authority in the matter of Motion for Leave for Review filed by S. K. Hydro (Pvt.) Ltd. (SKHPL) against Determination of the Authority dated March 28, 2014 | |
28-03-2014 | Determination of the Authority in the matter of Tariff Petition filed by S.K. Hydro (Private) Ltd. for Determination of Generation Tariff in respect of 870.25 MW Suki Kinari Hydropower Project | |
27-12-2010 | Decision of the Authority in the Matter of Motion for Recalculation filed by S. K. Hydro (Pvt.) Ltd. (SKHPL) under Rule 16(5) of NEPRA (Tariff Standards and Procedure) Rules, 1998, in response to the Determination of the Authority. | |
18-11-2008 | Determination of the Authority on Tariff Petition submitted by S K Hydro (Pvt.) Ltd (SKHPL) in respect of 840 MW Suki Kinari Hydropower Project. |
05-06-2025 | Notification S.R.O 1082(I)/2025 - NEPRA hereby notifies the Decision of the Authority dated May 14, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff for Malakand-III Hydropower Project of Pakhtunkhwa Energy Development for the quarter April - June 2025 on account of US CPI, N-CPI and Exchange Rate variation | |
16-05-2025 | Notification S.R.O 830(I)/2025 - NEPRA hereby notifies the decision of the Authority dated April 23, 2025 along with revised tariff components attached as Annex-I in the matter of quarterly indexation/adjustment of tariff for Malakand-III Hydropower Project of Pakhtunkhwa Energy Development Organizations Malakand-III (PEDO) for the quarter January - March 2025 on account of exchange rate variation, N-CPI local andUS CPI | |
14-05-2025 | Decision of the Authority in the mailer of Quarterly Indexation/Adjustment of Tariff for the Malakand-Ill Hydropower Project | |
23-04-2025 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for the Malakand-III Hydropower Project | |
02-01-2025 | Notification S.R.O 09(I)/2025 - NEPRA hereby notifies the decision of the Authority dated December 10,2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-III Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-III (PEDO) for the quarter October- December 2024 on account of US CPI, N-CPI and PKR/USD variations | |
10-12-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for the Malakand-III Hydropower Project | |
02-10-2024 | Notification S.R.O 1627(I)/2024 - NEPRA hereby notifies the decision ofthe Authority dated September 10,2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-III Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-III (PEDO) for the quarter July - September 2024 on account of US CPI, N-CPI and PKR/USD variations | |
10-09-2024 | Decision of the Authority in the matter of Quarterly Indention/Adjustment of Tariff for the Malakand-III Hydropower Project | |
13-06-2024 | Notification S.R.O 904(I)/2024 - NEPRA hereby notifies the decision of the Authority dated 22 May, 2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) for the quarter April - June 2024 on account of Exchange Rate variation, N-CPI local and US CPI | |
22-05-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for the Malakand-Ill Hydropower Project | |
21-03-2024 | Notification S.R.O 534(I)/2024 - NEPRA hereby notifies the decision of the Authority dated 29th February, 2024 in the matter of Quarterly Indexation1Adjustment of Local O&M and Water Use Charge Components of Tariff for October-December 2020 to October-December 2023 Quarters for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) on account of N-CPI variation | |
06-03-2024 | Notification S.R.O 396(I)/2024 - NEPRA hereby notifies the decision of the Authority dated 14t1i February, 2024 along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) for the quarter January - March 2024 on account of Exchange Rate variation, N-CPI local and US CPI | |
29-02-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Local O&M and Water Use Charge Components of Tariff for October-December 2020 to October-December 2023 Quarters for Malakand-Ill Hydropower Project | |
14-02-2024 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for the Malakand-Ill Hydropower Project | |
27-11-2023 | Notification S.R.O 1732(I)/2023- NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-III Hydropower Project of Pakhtunkhwa Energy Development Organizations Malakand-III (PEDO) for October - December 2023 quarter on account of Exchange Rate variation, N-CPI local and US CPI | |
13-11-2023 | Notification S.R.O 1560(I)/2023- NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) for July - September 2023 quarter on account of Exchange Rate variation, N-CPI local and US CPI | |
03-11-2023 | Decision of the Authority in the matter of Quarterly Indexation I Adjustment of Tariff for Malakand-Ill Hydropower Project | |
19-10-2023 | Decision of the Authority in the matter of Quarterly Indexation/ Adjustment of Tariff for Malakand-Ill Hydropower Project | |
12-07-2023 | Notification S.R.O 928(I)/2023- NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) for the quarter w.e.f. April 1, 2023 to June 30, 2023 on account of US CPI, CPI (Local), US$/PKR Exchange Rate variation | |
16-06-2023 | Decision of the Authority in the matter of Quarterly Indexation / Adjustment of Tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization (PEDO) C | |
09-05-2023 | NOTIFICATION S.R.O 538(I)/2023-NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) for the quarter w.e.f. January 1, 2023 to March 31, 2023 | |
12-04-2023 | Decision of the Authority in the matter of Quarterly Indexation / Adjustment of Tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization (PEDO) | |
19-01-2023 | NOTIFICATION S.R.O.58(I)/2023-, NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) for the quarter w.e.f. October 1, 2022 to December 31, 2022 | |
27-12-2022 | Decision of the Authority in the matter of Quarterly Indexation / Adjustment of Tariff for Malakand-IlI Hydropower Project of Pakhtunkhwa Energy Development Organization (PEDO) | |
28-10-2022 | S.R.O. 1967 (I)/2022-NEPRA hereby notifies the decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) for the quarter w.e.f. July-September 2022 on account of US CPI, CPI (Local), US$/PKR Exchange Rate variation | |
04-10-2022 | Decision of the Authority in the matter of Quarterly Indexation / Adjustment (July-September 2022) of Tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization (PEDO) | |
22-06-2022 | S.R.O No. 1585(I)/2022 - NEPRA hereby notifies the Decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization Malakand-IlI (PEDO) for the quarters w. e.f January 01 - March 31, 2022 and April 01 - June 30, 2022 on account of US CPI, CPI (Local), US$/PKR Exchange Rate variation | |
20-06-2022 | Decision of the Authority in the matter of Quarterly Indexation / Adjustment of Tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization (PEDO) | |
09-06-2022 | S.R.O. 1136 (I)/2022-NEPRA hereby notifies the decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) for the quarters w.e.f. July 1,2021 - September 30, 2021 and October ito December 31, 2021 on account of US CPI, CPI (Local), US$/PKR Exchange Rate variation | |
09-06-2022 | S.R.O. 956 (I)/2022-NEPRA hereby notifies the decision of the Authority along with revised tariff components regarding quarterly indexation/adjustment of tariff for Malakand-Ill Hydropower Project of Pakhtunkhwa Energy Development Organization's Malakand-Ill (PEDO) for three quarters w.e.f. October 1, 2020 -June 30, 2021 on account of US CPI, CPI (Local), US$/PKR Exchange Rate variation | |
24-12-2021 | Decision of the Authority in the matter of Quarterly Indexation / Adjustment of Tariff for Malakand-III Hydropower Project of Pakhtunkhwa Energy Development Organization (PEDO) | |
30-09-2020 | Decision of the Authority in the matter of Quarterly Indexation / Adjustment of Tariff for Malakand-III Hydropower Project of Pakhtunkhwa Energy Development Organization (PEDO) | |
07-09-2020 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Malakand-III Power Project (Pakhtunkhwa Energy Development Organization) | |
03-06-2020 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Malakand-III Power Project (Pakhtunkhwa Energy Development Organization) | |
10-03-2020 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Malakand-III Power Project (Pakhtunkhwa Energy Development Organization) | |
30-12-2019 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Malakand-III Power Project (Pakhtunkhwa Energy Development Organization) | |
29-08-2019 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Malakand-III Power Project (Pakhtunkhwa Energy Development Organization | |
23-05-2019 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Malakand-III Power Project (Pakhtunkhwa Energy Development Organization) | |
04-04-2019 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Malakand-III Power Project (Pakhtunkhwa Energy Development Organization) | |
27-02-2019 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Malakand-III Power Project (Pakhtunkhwa Energy Development Organization) | |
17-02-2017 | Decision of the Authority in the matter of Quarterly Indexation/Adjustment of Tariff for Malakand-III Power Project (Pakhtunkhwa Energy Development Organization) | |
27-02-2015 | Notification (i.e. S.R.O. 135(1)/2015) regarding Malakand-III (SHYDO) Indexations | |
10-10-2013 | Decision of the Authority in the Matter of Periodic Indexation/Adjustment of Tariff for Malakand-III Hydropower Project (SHYDO) | |
20-11-2014 | Decision of the Authority in the Matter of Quarterly Indexation / Adjustment of Tariff for Malakand-III Power Project (SHYDO) | |
10-10-2013 | Decision of the Authority in the Matter of Periodic Indexation/Adjustment of Tariff for Malakand-III Hydropower Project (SHYDO) | |
10-10-2013 | Decision of the Authority in the Matter of Change of Index for Indexation of Fixed O&M (Local) and Water Use Charges Components of Tariff for Malakand-III Hydropower Project (SHYDO) | |
04-10-2012 | Decision of the Authority in the Matter of Periodic Indexation /Adjustment of Tariff for Malakand-III Hydropower Project (SHYDO) | |
18-01-2011 | Decision of the Authority in the Matter of Periodic Indexation/Adjustment of Tariff for SHYDO's Malakand-III Hydro Power Project. | |
27-09-2010 | Decision of the Authority regarding Adjustment in SHYDO's Malakand-III Tariff at Commercial Operation Date (COD) | |
12-06-2008 | Corrigendum/ Addendum - Determination of the Authority in the Matter of Tariff Petition filed by Sarhad Hydel Development Organization (SHYDO) for its Malakand-III Hydropower Project. | |
02-04-2008 | Determination of the Authority in the matter of Tariff Petition filed by Sarhad Hydel Development Organization (SHYDO) for Malakand-III Hydropower Project. |
29-07-2022 | Decision of the Authority in the matter of Motion for Leave for Review submitted by Trident Power JB (Private) Limited for the 4.6 MW Ravi Hydropower Project | |
17-04-2021 | Decision of the Authority in the matter of Tariff Proposal submitted by Trident Power JB (Private) Limited for 4.6 MW Ravi Hydropower Project | |
14-02-2017 | Decision of the National Electric Power Regulatory Authority in the Matter of Application for Unconditional Acceptance of Upfront Tariff for Small Hydro Power Projects filed by Trident Power JB (Pvt.) Limited (TPJPL) for its 4.6 MW Ravi Hydropower Project at Lower Bari Doab Canal, Okara Cantt, Punjab |
20-06-2022 | Decision of the Authority in the matter of Motion for Leave for Review submitted by Trident Power GR (Private) Limited for the 7.5 MW LCC Hydropower Project | |
17-05-2021 | Decision of the Authority in the matter of Tariff Proposal submitted by Trident Power GR (Private) Limited for 7.55 MW LCC Hydropower Project | |
29-07-2022 | Decision of the Authority in the matter of Motion for Leave for Review filed by Uzghor Hydropower (Pvt.) Ltd. (UBPCO) for 82.25 MW Turtonas - Uzghor Hydropower Project | |
06-06-2022 | NOTIFICATION S.R.O. 671 (I)2022/ DECISION OF THE AUTHORITY IN THE MATTER OF TARIFF PETITION FILED BY UZGHOR HYDROPOWER PVT. LTD FOR TARIFF DETERMINATION OF 82.25 MW TURTONAS-UZGHOR HYDROPOWER PROJECT | |
19-04-2021 | Decision of the Authority in the matter of Tariff Petition filed by Uzghor Hydropower (Pvt.) Ltd. (UHPCO) for Tariff Determination of 82.25 MW Turtonas Uzghor Hydropower Project |